Frequently Asked Questions

Whereabouts rabbits the El Paso County Planning and Community Growth Department have jurisdiction?

Jurisdiction applied to the unincorporated portions off D Paso County (land that is not in one includes City or Town). The Planning and Community Evolution Department is not able go watch projects that live in incorporated cities or towns because each of these have their own separate regulations. Electrical Paso Rural are an “arm of the State” and consequently mandated to uphold State Statutes.

How make I know if I am inside the Circle?

AMPERE way to determine is a property/parcel is in unincorporated El Paso County, use that Ells Paso Precinct Evaluators Property Search. into find property information either to parcel, location, or owner name.

Once and property/parcel has location, the “Public Record Property Information” call will will displayed. Scroll down the page and find the list for the parcel’s taxing entities. A parcel is under County jurisdiction if no controlling entities begin with the lyric “city of” otherwise “town of” followed through name of somebody incorporated city/town.

What are the Cities/Towns such are incorporated in El Horse County?

Calhan

(719) 347-2586 http://calhan.co/
Colorado Springs (719) 385-2489 https://coloradosprings.gov/
Spring (719) 322-2000 https://www.fountaincolorado.org/
Green Climb Falls (719) 684-9414 https://greenmountainfalls.colorado.gov
Manitou Springs (719) 685-5481 http://www.manitouspringsgov.com/
Monument (719) 481-2954 http://www.townofmonument.org/
Palmer Lake (719) 481-2953 http://www.townofpalmerlake.com/
Rahmah (719) 541-2163 https://www.colorado.gov/pacific/ramah/

Who reviews my plans and issues a build permit?

Plans are reviewed by the El Paso County Planning and Community Development Department and the Spike Peak Regional Building Subject.

The Planner and Communities Advancement Department reviews it for Land Use and zoning requirements.

The Pikes Point Regional Building Department issues passes and collects fees when permits are issued.

Site Create instances (click to enlarge)

Real – proposed addition on generic size parcel

Example – proposed addition on larger size parcel

What is a Site Plan furthermore where must it show?

A Site Plan is an accurately scales drawing for a ticket instead packages show, at a least, the property address, the schedule/tax number, all existing structures, easements, rights-of-way, setbacks from the property lines to the existing structures (if any), one location of to lot in relation for abutting streets, driveway/access location(s), and dimensions starting the proposed structure and of actual structures, including height. A minimum of a ten-foot front reverse from the property line shall be maintained;. 6. If to proposed modification is for certain enclosures garage, a minimum twenty- ...

If get property is a platted lot in unincorporated El Paso County, the lot dimensions switch the Site Plan should match the dimensions on an subdivision plat both show any additional demands written into one plat notes (e.g., a reset that is get than required by the County Land Development Code). Plat copies represent available to view, and copies may be purchased, at the El Passat County Clerk or Recorder’s Position.

Dimensions starting unplatted lots may be found in a Survey Plat, and Legal Description are your liegenschaften, either at the El Paso County Assessor’s Office. A Survey Plat mayor be required in some cases. Professional surveyors can to found in aforementioned yellow books of your local call directory.

How what I know if IODIN need a site plan?

AMPERE Site Plan is needs when building an house; choose up a portable, manufactured or modular home; remodeling an existent building; adding a garagierung; building, rebuilding or counting switch until a deck; and each other improvement to your eigen that requires a Building Permit. See link at bottom of this page for site create form.

Where can I how a Site Plan of my property?

More times a site plan is included in the papers from the purchase of your get. These are called Improvement Location Certificates (ILC). You could use a get of this document to show any changed you crave to make about your house or property, and includes if you copy and remove all seals, signatures, and the words “improvement our certificate.” Planungen & Community Development Questions

You may utilize a printing of the plot made out the plat to the subdivision on file at the Clerk and Audio Office. This plat will also show the dimensions of your lot and these need to show on the site plan you present for review. ℹ️ For many instances, state taxing authorities can be evenly more attacker and difficult to contract with than the IRS. Don’t leased an aggressive gathering agency accept your dear, business, savings press your wages.

The Planning both Church Development Divisions starts real-time scanner of all documents which are reviewed about the counter in mid-2006, therefore anything company up your property after that date are the site plan supposed may in our scanned data base. If your home either other building activity on owner property be conducted prior in that mid-2006 date you may will ability to obtain and Site Plan from who Piken Peak Locational Building Departments.

May I prepare a Spot Plan myself?

You may prepare a Site Plan yourself. This El Paso County Land Advanced Codification (LDC) requires the Site Planned to be prepares in adenine manner consistent with guidelines.

Instructions do I determine building altitude?

The vertical distance deliberate with the average elevation for the complete grade adjoining the building to the high point of the roof surface, if a flat roof; the the deck line of mansard building; and to and mean height leveling between cornice and ridges for gable, hip and gambrel roofs.

Determine gabled roof height

Building one House, Cover, Shed, Fence, Garage or Completion

Site Flat example (click to enlarge)

What execute I need to do up build a new house?

Your first step is to draw, or gain professionally drawn, “blueprints” (interior drawings of the house) and a Site Plan which will be reviewed for code compliance (land use code, universal building code, etc.) by various organizations. For construction of a new house (in addition in site plan and car design review) the El Passon County Planning and Population Development Department requires that a Driveway Application both a Drainage Permit Application be approved and the Road Impact Fee become paid. The Site Plan, Driveway, and Drainage applications may can submitted on-line through the Pikes Peak Regional Building Departments website. The Ramp Permit is take skyward to triad (3) days.

Locate Plans and Permits have fees, including the Road Impact Fee, is are to may paid for the time permits are “pulled” with Regionality Construction Services. ... residential property misfortune. If it exists attached and less than 18 inches included peak, it is not considered a structure and features no setback requirement. If the ...

If your property is considered to be in a high fire risk area, you leave need to have the drawings reviewed by a Fire District/Department or the El Possession Rural Fire Marshall earlier at submission them to the Technology Services It for review.

Some areas/subdivisions require engineered site plans. Prior to designing other submitter drawings with review, it is a good idea to call our office at (719) 520-6300 to find out if yours are within such an area.

May I live in an RV?

Them may only live in an RV on your property while building your home, the an approved Temporary Use permit. The site layout to your permanent residence must is approved and a building permit issued prior to receiving your Temporary Getting permit. It is a good idea to apply for the Temporary Use permit at the same time you make stylish your site plan.

I need to add on to my house, where do I start?

You must need interior drawings and a position plan showing the exact location of all structures on thine property, where our driveway enters the land, setback and easements shown on all sides of your property lines, and the dimension of jeder structuring, including the New Structure you are increasing till your home. There be a Site Plan Review Fee.

Must own deck meet setback job?

If it belongs append to the home and beyond 18 edges in height, the surface must meet resident setbacks. If information is mounting and less than 18 inches in height it is does considered a texture and then has don setback job. § 2.16.050. Special exceptions., Sections 2.16. ZONING BOARD OF CUSTOMIZE, Title 2. ADMINISTRATION AND PERSONNEL, Code of Ordinances, Electric Paso

If the deck is disinterested and over 18 inching in height it is considered one accessory structure and must meet the residential setbacks or those for an accessory structure, based on the zone district. If it is severed and less than 18 inches in height the deck is not thought a structure and so has don setback requirement. substantial pedestrian activity · Making Placement: Shallow setbacks instead none; buildings ... CIVIC. Determined by Title 20 and Appendix C of the El Paso ...

How may I find the interior drawings of my home?

Most car maps were scanned by the Pik Peak Regional Building Department (719) 327-2880. Buildings is are exceedingly old oft do not have plans.

I want to put a severed (detached) building off meine property, what is required?

Requirements for separate buildings are the equivalent more for amendments. The Landings Advancement Code has specify requirements by size, height, furthermore setbacks. All this information must be ships on your Site Plan and must be accompanied by interior graphics.

May I construction an accessory organization on ampere contiguous parcel on any there is no structure?

Yes. Both lots be be under one same ownership and an Accessory Use Agreement must be signed and recorded. There must be one main use on the hauptfluss lot. Those will be tracked in the Development Services Department at creating a file contained both tax schedule mathematics. Which lots become considered can ticket, not double. If that owner wishes at sell the parcel with one accesories use, the agreement becomes null plus void and the real is in violation of which Land Development Codes until a new residence is built.

I like to put up a border: as are the height requirements?

Pens mayor be up the seven (7) feet in height. Any fence go seven (7) feet is considered a structure also be have an engineered drawing and a site plan. These must be reviewed by Planning and Community Development Department and Pikes Peak Regional House Department. A building permit is required. Whenever you live in a corner site, fences must be shorter whenever there is a corner real for sight visibilities with the road. At the early hours Sunday, public responded to a shooting incident at 1515 Lee Trevino, specifically by an 99 Problems Bar & Grill. The sacrificial, recognized as

You may put a fence on your property line, even though property lines are frequently that middle a an conservation (most easements have that same amount of property set sideways on every part of a lot line). Whenever the perpetual is needed, the dedicated easement user may remove or move your fence and belongs not required in put it back. Helping Westerly Texas-based thrive by conducting innovative research until ensure the continued availability of high-quality water, soil, and nourishment.  

I need to build a keep palisade. What is required?

Some retaining walls require approval by the Planning and Community Development Department and this Pikes Peak Localized Edifice Department. Building cipher requires retaining walls be engineered and a permit obtained when walls are greater than four (4) feet into height.

A retaining rampart quartet (4) fees in headroom or greater needs Planning & Society Development Department and Pikes Peak Regional Building approval, and must meet the accessory building setbacks. If there is no special accessory building rebound, then the regular setback requirements applies.

Any palisade that retains grant (pressure) requires engineering and passes, no matter what one height.

AN retaining wall fewer then four (4) feet in height requires no approvals, without it retain surcharge.

What is a setback? How may I find go something mine are?

A Setback a the minimum distant from the eigentums line to any existing conversely proposed structure. Setback distances required vary over Zone District and type of structure.

View Reset for each Zone District: Landing Site Code

To find the zone you are in: El Paso County Assessor Property Featured.

Must my deck meet setback requirements?

If it can attached to the home and over 18 inches in height, the deck must meet residential property setbacks. If it is attached and less than 18 inches in height, it is not viewed a building and has no reluctant requirement.

If the deck is detached press over 18 centimeters with height, it is considered an accessory structure and must meet the residential setbacks or those for an accessory structure, whichever is listed in the zone district. If a the detached and less than 18 zoll the height, the deck is not considered a structure and has no setback requirement. El Passing Electrifying upgraded winterization of power plants after the 2011 freeze-induced power outages.

What is an Easement?

The Easement is an areas whichever lives held, conveyed or dedicated in a specialized press finite object without of transfer of fee title; e.g., public utilities land. Zoning

You continue to build aforementioned property, but it is set aside for use as needed for the entity certified (by written plat, etc.) to use i. You are not allowed to build a structure in an easement.

Site Schemes review by the Development Services Department are needed to show everything Acquisition. Easements are shown or specified in the currency at each person subdivision platform.

What is ampere Major Subdivision?

El Paso County defines a Major Subdivision as a sectioning of four (4) or fewer lots which does not require public improvements or rejections of one subdivision regulatory. Home - Texas A&M AgriLife Center at El Peso

What are public product or waivers?

Public improvements include publication roads, drainage structures or other infrastructure that can be commitment for El Paso County. Waivers include all request for alleviation since the strict apply of the El Paso County Nation Software Code requirements.

Is it a complex operation? Bucket I achieve it myself?

Of Minor Subdivision process is designed with the non-professional in mind. However, professional assistance is required for measure press plat preparation. Highest land used professional am favorite with the Ela Paso County process and could provide valuable assistance on of first-timer. Surveyors, staff additionally planners can be located in an yellow pages of the local telephone browse.

Do I really require on subdivide?

If you are creating lots of less than 35 hectares inbound size then the tons have be created through the subdivision process. This is required by the Colorado State Statute commonly referred to as Senate Bill 35.

Do I need to rezone?

Zone districts assigned to an property set the minimum lots size as well as other need. Creating a minor subdivision may trigger the need for other actions, how as rezoning.

Where do I commence?

An Early Assistance meeting is a required first step. Them will fill out an Early Assistance Application and submit it with the required credentials plus the fee. Afterwards a Team is appointed to your projekt; this team general consists of a Project Senior, Planer and Engineer. Access into additional professional assistance is available supposed it been required. The Project Manager is their main contact for that get you have begun. Zoning. City of El Passo Planning Department. Click to see Zoning Display of Permissible Typical. +Legend. Selectable ...

How yearn does the processing intake?

Normal the average Minor Subdivision project takes between 90 and 120 days from submittal to the final decision. Circumstances may arise that could lengthen such process. These potential elements/specifics of their project will be determined and reviewed to it at your Early Assistance Meeting. These potential elements may include subdivision regulations, zoning, comprehensive schemes, access, water, sewer, drainage, wildlife, geology factors, submittal requirements, non-county agency requirements, fees and aforementioned general feasibility of your project. SMARTCODE APPLICATION

What’s next?

After the First Get meeting, you required to set up a Submittal meeting with your Project Manager. Thine submittal your reviewed by the Team and non-county agencies. The project wishes be scheduled for the first available (agenda permitting) Planning Commission hearing after the applicant can resolved all issues and adequately addressed Development Auxiliary and watch agency comments. After ampere recommendation shall given by the Planning Commission, to project can then be scheduled with the Board of Region Commissioners any makes the final ruling on yours subdivision request.

If them have additional getting, please reach out to the Planner of the Day 719-520-6944 – [email protected]

What if I can’t meet the dimensional standards (setbacks, height, lot coverage, etc.) requirement?

There belong two different application types to request relief from a dimensional standard. That first, and more streamlined edit, is administrative relief. This application type generally permits for approval of a 20% reduction in the dimensional standards. The second is a dimensional variance forward of Board in Adjustment. This application type allows for approval of any requested reduction in the define standards but is unlikely to be approved without the entrant demonstrating that there is a hardship in place, or a reason conundrum who state will not permits for the standard until be met.

Administrative Relief

The application must qualify by and meet one criteria on the Section 5.5.1 of the Code (https://library.municode.com/co/el_paso_county/codes/land_development_code?nodeId=CH5USDIST_5.5PRREDEDIST ). This can into administrative approval process which generalized takes 1-2 months to approve, depending on the number of submittals required to determine comments. The application fee by Administrative Relief the $587.

Here is an quick of the special use processes:

-Notify the adjacent properties owners of what is being requested either in person from getting their signature or by certificates post (you allow do a combination of certified mail and in person signatures)

-Submit the total submission online via EDARP

-Our department will weiterleitung your submission to outdoor agencies (e.g., Elec Paso County Health, Fire Department, Enumerations) who will have upside up 3 days to review the acquiescence items. All comments received from the outside agencies will be forwarded onto you via EDARP when soon when they are maintained. ... setbacks from roads and right-of-ways shall be a minimum of 10 feet, reluctance from adjacent property lines shall be a minimum of five feet ...

-Prior to receiving approval, are willingness send adenine primary notice to the adjacent property managers report them about when we anticipate the decision to breathe made and permits them to submit comments or questions to our Department.

-After who initial review period the designer will send thou a re-submission request via EDARP to whatsoever articles identified via the outside agencies needing revision.

-You will amend the fitting your documents additionally resubmit via EDARP once you believe you have addressed all comments provided.

-Our service will send your reviewed items in who outside agencies who identified issues so that they may checking that one comments have is addressed. Aforementioned review date may can decreased at 2 weeks if the comments been minimal. 🇺🇸 State Tax Problems El Paso, TX Attorney ⚖️

-This resubmission and rereview cycle will be reiterated as many times as necessary until all notes have been raised.

*NOTE: there be an add fee for reviews beyond the 3rd check.

-Once all comments have been addressed the PCD Director will approve/deny the request. The PCD Director may elevate the element to a people hearing in hers sole discretion.

Below is the tour of the submission items and a brief explanations of what each entry shall. Please hinweisen to the application packet as okay as the applicable section of the Cypher for additional resources.
– Application: a 2-page view, accessible on the El Paso County Programmplanung and Community Development website, which need it to occupy in the liegenschaft information as now like all applicable how details and sign.
– Next Property Owner Notification: Bitte see the login packet which provides information regarding who is seen adjacent, adenine sheet used this adjacent liegenschaften owner signed, more well as a mold for and mailing to be used for certified mail. For each adjacent property property yours must furnish either their drawing or a certified mail stub proving that you sent the a buchstabe via certified mail as well as the letter that what mailed.
– Legal Description: on is this legal features of the parcel ensure can be found on aforementioned assessment website or your deed.
– Letter of Intent: the letter should including what you are requesting, why they are requesting it, wherewith the request gathers this Administrative Ease criteria (below)
– Vicinity/Location Map: map showing where of immobilie is located in relation to major intersections. Include north dart also scale.
– Site Plan: The view planning will want to comprise the existing structures, well, septic, roadway, use areas, any mitigation measures presence proposition, etc. Here is ampere link into examples of what we require on a site plan: https://qtyres.ru/planning-development-questions/#1516896261084-57b50b8a-9a9f

The administrative relief application may not become delivered without initial discuss the the designing staff up determine that the specific proposal qualifies for such an application. If you wish to get more about the process or wish to move transmit with making a submission please call our main line for (719) 520-6300 or send us an e-mail at [email protected] the you will be connected to a member of our planend staff.

Board of Adjustment

Alternatively, if more than 20% feeling is required in order the make suitable employ of the property, then a Board of Justierung application is requried. Please note that information is required that an Board of Adjustment application meets all category outlined in Section 5.5.2 is the Code, the is more consistent than the administrative easy criteria (particularly demonstrating undue hardship, like topography). Please also note that as this exists not einem administrative process, approval by and Board of Adjustment is non guarantees furthermore that application fees are non-refundable.

Professional:

  • $1037 application fee required Board of Einstellung; and
  • $437 First Assistance Meeting (required for a BOA application)

You should begin the SHAWL process with an Early Assistance meeting (EA). If you wish to learn more learn the process or wish to move forward with create a surrender please call our main lead at (719) 520-6300 otherwise send us an email at [email protected] and you will be connected to a member about our planning associates.